Week 3 · Lesson 3.5
Simulation: the Wiring Bench
Wire real panels, shade them and protect the charger.
What you’ll do
Drag cables between panel connectors. Watch the meter and the change.
Wire in and , drop a leaf on a cell with and without , find a cold-morning danger, and feed the inverter 2.5 kW safely.
1 of 2
