Week 2 · Lesson 2.6

Put it to work

From checking a panel to planning a small assembly line.

Put it to work

Using Week 2 in real life

At home

small budget

  • Compare two panel datasheets: power, efficiency, temperature coefficient, warranty, certificates.
  • Ask installers for the panel's flash-test sheet and EL images.

Community or family

shared resources

  • Organize a group purchase of certified panels to cut prices.
  • Partner with a trade school to run a 2-day panel-repair and testing workshop.

Business or investor

bigger budget

  • A small semi-automatic line (20–50 MW) costs a few million dollars including building and certification. Start with a feasibility study: buyers (), duties, power, staff.
  • Lock in at least one large buyer before ordering machines.
  • Look at local glass, frames and racking as first local-content steps.

Safety: Factories need trained staff, machine guarding, hot-press safety and electrical testing procedures. Follow local labor and electrical codes.

For learning only, check your local codes and use qualified professionals.

1 of 4