Week 2 · Lesson 2.6
Put it to work
From checking a panel to planning a small assembly line.
Put it to work
Using Week 2 in real life
At home
small budget
- Compare two panel datasheets: power, efficiency, temperature coefficient, warranty, certificates.
- Ask installers for the panel's flash-test sheet and EL images.
Community or family
shared resources
- Organize a group purchase of certified panels to cut prices.
- Partner with a trade school to run a 2-day panel-repair and testing workshop.
Business or investor
bigger budget
- A small semi-automatic line (20–50 MW) costs a few million dollars including building and certification. Start with a feasibility study: buyers (), duties, power, staff.
- Lock in at least one large buyer before ordering machines.
- Look at local glass, frames and racking as first local-content steps.
Safety: Factories need trained staff, machine guarding, hot-press safety and electrical testing procedures. Follow local labor and electrical codes.
For learning only, check your local codes and use qualified professionals.
1 of 4
