Sand to Power · workbook
Week 2: Cells, panels and the assembly line
Lessons
- How a solar cell works, What happens inside a cell when light hits it.
- What’s inside a panel, The sandwich of glass, film, cells and frame.
- The assembly line and its bottleneck, Eight stations, and why the slowest one rules.
- Pricing every watt, Where the money goes, and how a local factory competes with imports.
- Simulation: design the Panel Line, Pick machines, balance the line and price every watt.
- Put it to work, From checking a panel to planning a small assembly line.
- Week 2 checkpoint, Three questions to lock in the week.
Key words
- Solar cell
- A treated wafer with metal lines printed on it. Light knocks electrons loose and the lines collect them as current.
- P-N junction
- The boundary inside a cell between two differently doped layers. It pushes freed electrons one way, creating voltage.
- Volt (V)
- The ‘push’ of electricity.
- TOPCon
- A common modern cell design with an extra thin layer that wastes less energy. Most new panels in 2026 use it.
- Series
- Connecting things end-to-end (+ to −). Voltages add, current stays the same.
- Busbar / ribbon
- A thin metal strip that connects cells (in panels) or battery cells together and carries current.
- EVA / POE film
- Clear plastic films that melt in the laminator and glue cells to the glass, keeping water out.
- Backsheet
- The tough plastic layer on the back of a panel (or a second sheet of glass).
- Junction box
- The small box on the back of a panel where the cables come out. It holds the bypass diodes.
- Laminator
- A heated vacuum press that melts the films so the panel sandwich becomes one sealed piece.
- Bill of materials (BOM)
- A full list of every part and material in a product, with amounts.
- EL test (electroluminescence)
- Running current through a panel in the dark so it glows; cracks show up as dark lines.
- Stringer
- A machine that solders cells into a row (a ‘string’) with metal ribbons.
- Layup
- Placing glass, film, cell strings, film and back sheet in a stack, ready to laminate.
- Flash test
- A bright, precise flash of light that measures each finished panel's real power.
- Cycle time
- How long one station takes to finish one product.
- Bottleneck
- The slowest step on a line. It sets the speed of the whole line.
- Uptime
- The share of time machines are actually running, not broken or being cleaned.
- Yield (factory)
- The share of products that come out good. 98% yield = 2 of every 100 are rejected.
- Cost per watt ($/W)
- Total cost divided by the watts of panels made. The main way solar panels are priced.
- Capex
- Capital expenditure: money spent up front on machines and buildings.
- Warranty
- A promise that a product will perform for a set time (panels: often 25–30 years).
- Opex
- Operating expenditure: running costs like wages, power and materials.
- FOB (free on board)
- Price of goods loaded on the ship at the seller's port, before shipping, insurance and duty.
- Import duty / tariff
- A tax a country charges on goods brought in.
- Lead time
- How long between ordering and receiving.
- Incentive
- Government support like tax credits or lower duties to encourage an industry.
- Economies of scale
- Making more of something so each unit costs less.
- Certification
- An independent lab's proof that a product meets a safety or quality standard (e.g. IEC 61215, UL 9540).
- Shift
- A block of working hours (usually 8). Three shifts run a factory 24 hours.
- Off-taker
- A buyer who agrees in advance to buy a factory's output.
Worked examples
The assembly line and its bottleneck
What a “100 MW line” really makes
A line finishes 20 panels per hour of 550 W. It runs 3 shifts, 350 days, with 85% uptime and 98% yield. What is its real yearly output?
- Panels per day: 20 × 24 h = 480.
- Watts per year at perfect running: 480 × 550 W × 350 ≈ 92 MW.
- Real: 92 × 0.85 × 0.98 ≈ 77 MW. Fewer working days or slower starts bring it near 66 MW.
Answer: Plan on about 66–77 MW, not 100. Try your own line below.
Now try your own numbers:
Pricing every watt
Does more output lower cost?
Materials cost $0.10/W. Fixed costs are $1.5 million a year. Compare a factory making 20 MW with one making 66 MW.
- 20 MW: $1,500,000 ÷ 20,000,000 W = $0.075/W → total $0.175/W.
- 66 MW: $1,500,000 ÷ 66,000,000 W = $0.023/W → total $0.123/W.
Answer: Same factory, three shifts: about 5¢ cheaper per watt. That's economies of scale.
Now try your own numbers:
My action plan
Ideas from “Put it to work”: Compare two panel datasheets: power, efficiency, temperature coefficient, warranty, certificates. · Ask installers for the panel's flash-test sheet and EL images. · Organize a group purchase of certified panels to cut prices.
One thing I learned that surprised me
One step I'll take in the next 30 days
Who I'll talk to (installer, electrician, partner, lender)
What I still need to find out
For learning only. Check local codes and use qualified professionals for electrical and battery work.