Week 2

Sand to Power · workbook

Week 2: Cells, panels and the assembly line

Name:Date:

Lessons

  1. How a solar cell works, What happens inside a cell when light hits it.
  2. What’s inside a panel, The sandwich of glass, film, cells and frame.
  3. The assembly line and its bottleneck, Eight stations, and why the slowest one rules.
  4. Pricing every watt, Where the money goes, and how a local factory competes with imports.
  5. Simulation: design the Panel Line, Pick machines, balance the line and price every watt.
  6. Put it to work, From checking a panel to planning a small assembly line.
  7. Week 2 checkpoint, Three questions to lock in the week.

Key words

Solar cell
A treated wafer with metal lines printed on it. Light knocks electrons loose and the lines collect them as current.
P-N junction
The boundary inside a cell between two differently doped layers. It pushes freed electrons one way, creating voltage.
Volt (V)
The ‘push’ of electricity.
TOPCon
A common modern cell design with an extra thin layer that wastes less energy. Most new panels in 2026 use it.
Series
Connecting things end-to-end (+ to −). Voltages add, current stays the same.
Busbar / ribbon
A thin metal strip that connects cells (in panels) or battery cells together and carries current.
EVA / POE film
Clear plastic films that melt in the laminator and glue cells to the glass, keeping water out.
Backsheet
The tough plastic layer on the back of a panel (or a second sheet of glass).
Junction box
The small box on the back of a panel where the cables come out. It holds the bypass diodes.
Laminator
A heated vacuum press that melts the films so the panel sandwich becomes one sealed piece.
Bill of materials (BOM)
A full list of every part and material in a product, with amounts.
EL test (electroluminescence)
Running current through a panel in the dark so it glows; cracks show up as dark lines.
Stringer
A machine that solders cells into a row (a ‘string’) with metal ribbons.
Layup
Placing glass, film, cell strings, film and back sheet in a stack, ready to laminate.
Flash test
A bright, precise flash of light that measures each finished panel's real power.
Cycle time
How long one station takes to finish one product.
Bottleneck
The slowest step on a line. It sets the speed of the whole line.
Uptime
The share of time machines are actually running, not broken or being cleaned.
Yield (factory)
The share of products that come out good. 98% yield = 2 of every 100 are rejected.
Cost per watt ($/W)
Total cost divided by the watts of panels made. The main way solar panels are priced.
Capex
Capital expenditure: money spent up front on machines and buildings.
Warranty
A promise that a product will perform for a set time (panels: often 25–30 years).
Opex
Operating expenditure: running costs like wages, power and materials.
FOB (free on board)
Price of goods loaded on the ship at the seller's port, before shipping, insurance and duty.
Import duty / tariff
A tax a country charges on goods brought in.
Lead time
How long between ordering and receiving.
Incentive
Government support like tax credits or lower duties to encourage an industry.
Economies of scale
Making more of something so each unit costs less.
Certification
An independent lab's proof that a product meets a safety or quality standard (e.g. IEC 61215, UL 9540).
Shift
A block of working hours (usually 8). Three shifts run a factory 24 hours.
Off-taker
A buyer who agrees in advance to buy a factory's output.

Worked examples

The assembly line and its bottleneck

What a “100 MW line” really makes

A line finishes 20 panels per hour of 550 W. It runs 3 shifts, 350 days, with 85% uptime and 98% yield. What is its real yearly output?

  1. Panels per day: 20 × 24 h = 480.
  2. Watts per year at perfect running: 480 × 550 W × 350 ≈ 92 MW.
  3. Real: 92 × 0.85 × 0.98 ≈ 77 MW. Fewer working days or slower starts bring it near 66 MW.

Answer: Plan on about 66–77 MW, not 100. Try your own line below.

Now try your own numbers:

Pricing every watt

Does more output lower cost?

Materials cost $0.10/W. Fixed costs are $1.5 million a year. Compare a factory making 20 MW with one making 66 MW.

  1. 20 MW: $1,500,000 ÷ 20,000,000 W = $0.075/W → total $0.175/W.
  2. 66 MW: $1,500,000 ÷ 66,000,000 W = $0.023/W → total $0.123/W.

Answer: Same factory, three shifts: about 5¢ cheaper per watt. That's economies of scale.

Now try your own numbers:

My action plan

Ideas from “Put it to work”: Compare two panel datasheets: power, efficiency, temperature coefficient, warranty, certificates. · Ask installers for the panel's flash-test sheet and EL images. · Organize a group purchase of certified panels to cut prices.

One thing I learned that surprised me

One step I'll take in the next 30 days

Who I'll talk to (installer, electrician, partner, lender)

What I still need to find out

For learning only. Check local codes and use qualified professionals for electrical and battery work.